We are only a little over 2 weeks away from closing!! What??!?!?! Where did the time go? Remember that I said I was going to build our kitchen table with my dad? Well, we started this weekend, and guess what .. we severely underestimated the time it would take! Haha! Oh well.
We worked on it all day Saturday and Sunday and got the top completed! This was the hardest part because you have to make sure the wood is all flush and flat, and wood is not perfect (who knew?), so all the boards were a little bowed in places. It took a lot of strength, quick drilling, and teamwork to get these boards straight and flush. I think it turned out pretty nice if you ask me!
We also got all of the wood cut for the legs of the table but haven't assembled it yet. This took a lot of cutting and prep work people!
So next steps include:
We also went by the house quickly this weekend to meet our fence guy. We talked to him and got things situated. We saw that they were installing carpet in the house so we didn't want to go in and get in the way!
Another change we saw is they put in the posts for the front porch (it's no longer being held up by scrawny looking wood).
This week's Agenda:
There's really not much else to do! It's mostly just fixing tiny things and putting final touches on stuff. Lanscaping won't be done until about a week before closing so we won't see that for awhile. So exciting! We are so excited to move, but it's coming down to the wire!
To Do List:
Hope everything is going well for everyone else!
We worked on it all day Saturday and Sunday and got the top completed! This was the hardest part because you have to make sure the wood is all flush and flat, and wood is not perfect (who knew?), so all the boards were a little bowed in places. It took a lot of strength, quick drilling, and teamwork to get these boards straight and flush. I think it turned out pretty nice if you ask me!
![]() |
We also got all of the wood cut for the legs of the table but haven't assembled it yet. This took a lot of cutting and prep work people!
So next steps include:
- Drilling some holes to prep the pieces
- Assembly of the legs
- Sanding everything (this is probably going to take forever)
- Stain (hopefully only 1 coat)
- Strategically sanding to give it an older look
- Polyurethane
- Attach the top and the bottom
- Done!
We also went by the house quickly this weekend to meet our fence guy. We talked to him and got things situated. We saw that they were installing carpet in the house so we didn't want to go in and get in the way!
Another change we saw is they put in the posts for the front porch (it's no longer being held up by scrawny looking wood).
![]() |
| She is looking pretty sexy if you ask me! |
This week's Agenda:
- The deck
- Another round of grading (I think)
- Final touches and adjustments (straightening cabinets, fixing paint here and there, etc).
There's really not much else to do! It's mostly just fixing tiny things and putting final touches on stuff. Lanscaping won't be done until about a week before closing so we won't see that for awhile. So exciting! We are so excited to move, but it's coming down to the wire!
To Do List:
- Call water company
- Call trash company
- Call electric company
- Get cable/internet ready
- Pack
- Get blinds
- Get garage door opener
- Finish reupholstering the ugly couch
- Finish the table
- Finish up my Grad School classes
Hope everything is going well for everyone else!












